And Then There Was A Pool (Hole)

Yet another week has gone by since my last update.  There has been some very positive movements by Casa Yucatan Construction.  They’ve continued on the perimeter walls and they’ve dug the “hole” for the big pool.  There was a little bit of work getting through all the limestone but it helped to have a jackhammer attached to the tractor in order to get through the tough parts.

Looking east towards the Master Suites. The pool exists sort of.

Looking West towards the front of the casa.

The first level block is in place, just one more story at the same height (12’)

A view of the pool (hole).

Our “green” neighbor to the north. Hopefully this will be blocked by the second story walkway..

Looking west from the pool breezeway.

Looking west to the street from Jean’s Master Suite.

Frolicking in the pool.

Another shot towards the east side of the property from the street.

Looking to the rear of the property.